Tanzania Update

posted in: Tanzania | 0

WE FOUND WATER! After safely regrouping at Dodoma, Tanzania, all Boston Professionals and Harvard EWB members have started off their work swiftly in Mkutani and Mapinduzi. And we are very happy to announce that we have successfully drilled a new … Continued

Tanzania Update

posted in: Tanzania | 0

Mapinduzi * repaired a leak near DP5 (near the trough) * repaired the break between DP8 and the storage tank * met with lecturers from University of Dodoma * visited biogas plant * visited solar pump and documented configuration Mkutani … Continued

Tanzania Update

posted in: Tanzania | 0

Thursday and Friday were Mapinduzi days. Bill concentrated on improvements to the plumbing of the ‘short-term solution’, while I looked at the fuel consumption of the gen-set – which is an 11 kW unit similar to what many Americans have … Continued

Tanzania Update

posted in: Tanzania | 0

Another Tanzania Update! The EWB group had a very productive meeting with leaders from Mapenduzi A and B on Friday. The team learned through these discussions that the temporary water supply system has been reliable, although the cost of fuel … Continued

Tanzania Update

posted in: Tanzania | 0

In Dodoma again! Hurray! I had a hold-up on my journey from China, a missed connection in Guangzhou which meant I was stuck there for 24 hours. So I only had one day in Dar es Salaam instead of two, … Continued